When the members of the Improved Construction Practices Committee (ICPC) heard about the difficulty a construction lienor had in getting a construction lien timely recorded, they decided to take immediate action and participate in the proceedings. The lienor, Pritchett Trucking, Inc., delivered its construction lien in the amount of $118,288.83 and recording fee to the
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
Vivamus magna justo, lacinia eget consectetur sed, convallis at tellus.
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
13th
13th
Nov, 2023
Welcome to WordPress. This is your first post. Edit or delete it, then start writing!
20th
20th
Jan, 2016
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
19th
19th
Jan, 2016
Nam lacinia arcu tortor, nec luctus nibh dignissim eu nulla sit amet maximus.
19th
19th
Jan, 2016
Vivamus magna justo, lacinia eget consectetur sed, convallis at tellus.


